Vertex Sunnyvale ConcreteVertex Sunnyvale Concrete

Concrete Parking Lot Building in Sunnyvale CA - a lot that drains and carries the trucks

Cracked truck lanes, puddles by the door, a dumpster pad breaking up? We rebuild them in concrete, starting with the base and drainage underneath.

Covered concrete patio with dark support beams, outdoor dining furniture, and large planters.
  • Licensed and insured.
  • Free in-person estimates.
  • Replies within 1 business day.

What goes into building a concrete parking lot in Sunnyvale?

Concrete parking lot building in Sunnyvale means we dig out, form, pour and finish the pavement your cars, delivery trucks and customers drive on, so the lot stays flat, drains where it should and holds up under the traffic it actually gets.

Most people call me because the old lot is breaking up where the trucks turn, or water sits by the front door after every rain, and they want to know if concrete is worth it. A lot is flatwork, the same family of flat pours as drives and walks, but it carries a lot more weight. So the price mostly comes down to its size, how much of it has to stand up to trucks and dumpsters, whether old pavement has to come out first and how much drainage work it needs. The schedule turns on what the city wants to review, the weather on pour day and how much of the lot you can close while the concrete cures, which is the wait while it hardens and gains strength before anyone drives on it. The written estimate I give you after seeing the site puts a price on your own lot.

How can you tell a parking lot needs replacing?

  • Cracks where trucks turn

    You'll see a web of cracks or broken corners in the delivery lane, at the entrance or in front of the dumpster pad. That usually means the pavement there was built like the parking stalls even though it carries much heavier loads, and once water gets into those cracks the base softens and the broken patch spreads every season.

  • Water standing after rain

    Puddles that sit for a day, or a sheet of water running toward the building, tell you the surface was never sloped to carry water off. Standing water works its way under the edges and into the base, so a drainage problem you leave alone turns into a settling problem.

  • Sunken or tilted sections

    A section that's dropped below its neighbor leaves a lip that catches carts, heels and tires. It usually means the dirt under it was raked flat instead of dug out and packed, and while you wait that lip keeps growing into a trip spot your customers walk across every day.

How we build a concrete parking lot

I start every lot with the same question. Where do the trucks, deliveries and dumpsters go? Those spots get their own plan, apart from the parking stalls, because a garbage truck backing onto a dumpster pad every week puts a load on the slab that a row of sedans never will. I'll also give you my honest take on whether concrete or asphalt suits the way your lot gets used, even if the answer is asphalt for part of it. From there our crew digs out and packs the subgrade, which is the ground the slab sits on, and sets the forms with a slope that carries water away from the building. We tie in rebar, the steel that holds the slab together, where the plan calls for it, and we pour in the cool of the morning so the top doesn't dry out weak and dusty in the afternoon heat. Then we give it a broom finish, a light texture that keeps tires and shoes from slipping, and cut the control joints, shallow grooves that give the concrete a straight line to crack along instead of a random one, as soon as the slab can take the saw. If the budget gets tight, I'd rather spend it on the base than on a fancy finish, because nobody sees the base on day one, and a city crew taught me it's what decides whether the slab is still flat years from now.

A lot usually comes with other concrete around it. Light poles, sign posts, a carport or a dumpster enclosure wall each need concrete footings, the buried pads that keep them from leaning or sinking, and we pour those along with the lot so they line up with the paving. If the building beside the lot has settled and its doors stick or its floor has cracked, we can look at foundation raising before new paving goes in right up against it.

  1. Full concrete lot

    This suits lots with steady truck traffic, tight turns or heavy daily use, where you want one hard surface everywhere. We still build the truck lanes and dumpster pad heavier than the stalls, but it all goes in as one plan.

  2. Concrete for the heavy spots only

    This suits a lot that's mostly car parking with the hard use in a few places, like the entrance, the loading area and the dumpster pad. Those spots get concrete and the stalls stay asphalt, so you're paying for concrete only where the weight lands.

Get a free on-site estimate for your parking lot

We'll get back to you within one business day to set a time, and then I come out myself to walk the lot and write your estimate. It's free, and there's no obligation to go ahead.

Based in
Sunnyvale, CA 94087
Hours
Mon–Fri: 6 AM–11 PM, Sat–Sun: 7 AM–11 PM
(669) 348-0343

What happens after you call about a parking lot?

Here's how a parking lot job goes from your first call to the walk-through on the finished pavement, and who you'll deal with at each step.

  1. Call and set a visit

    Call (669) 348-0343 or send the form, and I'll come out to look at the lot, ask how it gets used from opening time to the last delivery and talk through your choices. Bring your questions, because I'll have plenty of my own.

  2. Get your written estimate

    You get a written estimate for the lot we talked through, so you know the price before anything is scheduled. We check what the city asks for before it goes on the calendar, since a permit review can set the start date.

  3. We build it, then walk it

    Our own crew does the work with me on site checking it as it goes. When it's done, we walk the finished lot with you and go over how to look after it, like what to watch around the joints and drains.

Why Sunnyvale property owners call Vertex Sunnyvale Concrete for parking lots

  • I write every estimate myself

    The person who walks your lot and asks where the trucks turn is the same one standing on site while our own crew pours it. Nothing gets lost between what we agreed on and what goes in the ground.

  • Trained on a city crew

    I learned concrete pouring sidewalks and curbs on a city crew and fixing what tree roots and time had broken, then started this business in Sunnyvale in 2013. After 13 years I still look at a slab the way that crew taught me, from the ground up.

  • Licensed and insured for lot work

    California requires anyone who builds or alters a parking lot to hold a state contractor's license when the job needs a building permit, uses any extra workers or runs $1,000 or more in labor and materials. We're licensed and insured, so that's settled before you sign anything.

If you're weighing a new lot, the best first step is letting me see how yours really gets used, so tell me about it on our contact page and I'll come take a look.

Parking lot permits and paving work in Sunnyvale

If your lot serves a business or an apartment building, the city requires the right permits, inspections and approval from its planning staff for any new construction or remodel, so plan on your lot being reviewed before it's poured. Plans go through the Permit Center at City Hall, where building, fire, planning and public works engineering staff review them in one place, and if it's your first project, the center asks you to call so staff can explain the process, the documents you'll need and whether you'll need plan review. A project that creates or replaces 5,000 square feet or more of hard surface, unless it's a single-family home, also needs a countywide worksheet filed with the project application. We check all of that with the city before anything is scheduled, and if your project calls for a permit, we pull it, handle the paperwork and meet the inspector on site.

A lot of the lots we see here sit behind small shops and apartment buildings that were paved years ago, with the dumpster pad and delivery lane built no heavier than the stalls, so that's where the breaking up starts. We see the same thing on jobs in Santa Clara and Mountain View, and we fix it the same way, by giving those heavy spots their own plan.

Questions about concrete parking lots in Sunnyvale

Is concrete or asphalt better for a parking lot?

Asphalt can cost less up front and go down faster in phases, while concrete can be the better pick where heavy trucks load, turn slowly, fuel up or wear the surface hard. That's the split one contractor's guide draws, and it's why the choice should follow how your lot gets used, sometimes with concrete only in the heavy spots.

How long does a concrete parking lot last?

One concrete trade association says a concrete lot on a solid base with good drainage lasts 30 to 40 years. It puts that at more than double the average life of asphalt, which helps make up for concrete's higher first cost. That's why we put the base and the drainage first.

How much does a concrete parking lot cost in California?

Installed concrete in California usually costs about $7 to $20 per square foot, and that statewide range covers concrete work in general, not parking lots alone. Where your lot lands turns on the things I check on site, like the truck areas, any tear-out and the drainage. Your written estimate gives you the price for your own lot.

How do I plan a parking lot for delivery trucks and dumpsters?

Mark where trucks drive, load and turn, and where the dumpster pad and fire lanes sit, before anyone draws the pavement. Design guidance says truck routes, dumpster pads, entrances and fire lanes should be kept apart from regular parking stalls when the loads differ, because those heavy areas follow their own pavement design. Bring that rough map to the site visit and we'll start from it.

What is the best way to compare concrete parking lot bids?

Compare what each bid says about the work under and around the concrete, not just the price of the concrete itself. One contractor's guide says a lot's performance depends on the supporting soil and base, the slab design, the joint layout, the drainage and the curing, so a bid that skips those leaves you guessing.

How long before cars and trucks can drive on a new concrete parking lot?

Cars, construction traffic and heavy trucks each get their own go-ahead, so ask when each one can come back rather than when the lot opens. Design guidance says curing starts right after the pour and sets separate opening criteria for each kind of traffic when they're needed. We go over that with you before the pour so you can plan deliveries around it.

  • Concrete footings

    Light poles, sign posts, carports and enclosure walls around a lot each need a solid buried base, or they lean and crack the paving next to them.

  • Foundation raising

    If the building beside your lot has dropped at one corner, lifting it back first keeps new pavement from meeting a doorway that sits too low.

Service areas around Sunnyvale for concrete work

Vertex Sunnyvale Concrete is based in Sunnyvale, California, and we work across it and the cities around it, from Cupertino to Campbell. These 12 cities each have their own page, and they're not the only places we go.

Book a site visit for your lot

Have the lot's rough size and the routes your trucks and deliveries take ready when you call (669) 348-0343, because that's where I start sketching the plan.

CallRequest an estimate